Wood Door Buying Checklist for Dubai Projects

For a Dubai fit-out or villa project, prepare a door schedule, identify exposed entrances and agree with the local project team on the documentation they will need.

Group by opening and exposure

Separate interior doors, covered entrances and exposed entrances in the schedule. For exterior openings, include the orientation, overhead cover, finish preference and expected exposure to direct sun and moisture.

Clarify site drawings and approval responsibilities

Give the finished opening sizes in millimetres, wall build-up, floor level and clearances. Confirm who reviews the door-set drawings, finish samples and any project-specific evidence before the order.

Set delivery and installation scope

State the city, delivery point, receiving constraints and who is responsible for unloading and installation. Ask the supplier to identify packing, hardware and documentation separately on the quote.